Leeds 1st

Tata Steel played a key role in Network Rail's ambitious £165 million project from carrying out the initial site surveys, feasibility and outline design stages through to the detailed design of the switch and crossing layouts

Client

Network Rail London North Eastern Zone

Services Provided

This was a multi-disciplinary project which involved team members from Permanent Way, Civil Engineering, Signalling and Electrical and Mechanical.

Special Features

The project required many innovative solutions to accommodate non-standard arrangements for the concrete bearers, including the famous Whitehall diamond area and two new tracks that have been constructed for the Huddersfield & Transpennine route to alleviate the bottleneck at Holbeck Junction.